![]() Switch back to the original model and add the.IMX file data is the same process I would use to transfer content between Infraworks and Civil 3D. Although it is a two-step process, it seems to produce the combined model with less work involved and reduced objects to re-configure after import. A second option is to export and import a. SQLite database information from another model has been quite a process due to the reconfiguring of objects. SQlite database, that is an optional data source that can be added. ![]() Since the Infraworks model itself is built from a. There are two options to consider when combining models in Infraworks. When possible, include some overlapping area to avoid “gaps” in the data. Select the same coordinate system as the original model when creating the second model to supplement the data in the original. Create a supplemental model covering the extended area of interest Start with a Model Builder model of the Project Site as usualĮxisting Project Model (to be extended West) 2. Rather than starting over, we can download the additional area we need, then combine the models using data sources in Infraworks. Perhaps the project site is expanding, or we didn’t quite catch everything we needed to give us a good picture of contributing drainage areas around the project site. In this situation, a project site may have been generated in the preliminary stages, and after some initial evaluation it is determined that we need more information about the surrounding areas. One of the more recent questions I have been getting is how to “add” to a model area after the original has already been generated using the Model Builder. There has been an increased interest in Infraworks lately, and with an AEC Collection subscription, access to Infraworks is included as an optional software entitlement.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |